Commissioning
Molycorp Minerals
Owners agent with regard to commissioning and 3rd party testing oversight for the Molycorp rare earths mine. A 50 MW combined heat and prime power system with MV and LV distribution, controls, and protection systems. Working on all aspects of this project including being tasked with everything from testing, to oversight, start-up, QA, commissioning, integration, field corrections, and training.
Sempra – Copper Mountain Solar Phase I & Phase II – Boulder City NV
Commissioning, Device Testing, and Oversight for. Scope included substation device testing, commissioning, and SCADA programming & integration.
City of Dreams Cotai Strip Resort
In collaboration with JBA Asia Consulting Engineers, provided design, deployment, and commissioning services of facilities 11KV distribution and emergency power system and implemented the second “closed transition” power system in Macau.
Switch Communications
Start up, testing, and commissioning assistance for the deployment of data center power systems including; NAP 5, NAP 4 Substation, NAP 7 – Blocks 1, 2, 5, & 6.
Wynn Hotel and Casino Macau
CPC was a key contributor to the deployment of the first commercial facility emergency power system capable of “closed transition” operation in Macau. Conducted full redesign of control system, start-up, and commissioning. Including working with the local regulatory authority to allow us to implement the first power system with closed transition transfer capability. Went on to implement and commission two additional power systems using this same scheme for Wynn’s Diamond Tower and the City of Dreams Cotai Resort.